Quality Control
Quality control runs through every link of production
The physical and chemical experiment center built in accordance with the national secondary standards can meet tensile testing, low temperature impact at minus 80 degrees Celsius, chemical composition analysis, metallographic analysis, non-metallic inclusion analysis, gas content analysis, grain size analysis, and non-magnetic Inspection and testing of steel magnetic induction intensity, magnetic induction gradient, intergranular corrosion, etc.